A SAEP-347 stockist is a Saudi-registered supplier that maintains physical inventory of materials listed in Saudi Aramco Engineering Procedure SAEP-347, Annex 4 — the 59 stockable 9COMS material numbers covering valves, pipe fittings, flanges, and metallic pipes.
The procedure was introduced to streamline procurement for Saudi Aramco's most frequently purchased commodity materials. Instead of specifying individual material requirements each time, procurement engineers can reference an Annex 4 material number and a qualified stockist supplies the corresponding item with all required documentation.
In Saudi Aramco's Materials System (SAP), these 59 items are classified as 9COMS (9000-class commodity materials that are stockable). Procurement engineers searching for a "9COM supplier," "9CAT valve supplier," or "SAEP-347 Annex 4 stockist" are looking for the same thing — a supplier holding physical stock of these 59 material numbers in Saudi Arabia.
All 59 SAEP-347 Annex 4 material numbers follow Aramco's 10-digit format beginning with 6000XXXXXX.
A SAEP-347 stockist is a Saudi-registered supplier maintaining physical inventory of all 59 SAEP-347 Annex 4 material numbers — the 9COMS items covering valves, fittings, flanges, and metallic pipes — with EN 10204 3.1 mill test certificates and full heat-number traceability required for Saudi Aramco Goods Receipt.
Before selecting a SAEP-347 stockist for your western region project, verify that the supplier meets all five criteria below. A stockist that fails any one criterion cannot support Aramco Goods Receipt.
The stockist must hold a valid Saudi Arabian CR (Commercial Registration). Verify the CR number matches the invoice and shipping documents. Gulf Union Ozone CR: 4030570569.
Saudi Aramco procurement typically requires ISO 9001:2015 certification for qualified stockists. Request a current certificate with a scope covering industrial parts distribution. Gulf Union Ozone: ISO 9001:2015 certified.
A genuine stockist maintains physical inventory in Saudi Arabia — not a virtual catalogue. Confirm the supplier can dispatch the required SAEP-347 Annex 4 items within days, not weeks. Gulf Union Ozone: Jeddah warehouse, 48–72h dispatch.
Every SAEP-347 Annex 4 item must be accompanied by an EN 10204 3.1 MTC showing actual (not nominal) chemical and mechanical values, the heat number, and a certified 3.1 inspector's signature. Photocopied or 2.2 certificates will cause GR rejection. MTC guide →
A Certificate of Conformance confirming the item meets the specified SAEP-347 material number requirements must accompany each order. The CoC must be signed by an authorized representative and cross-referenced to the MTC heat number for full traceability.
CR 4030570569 · ISO 9001:2015 · Jeddah warehouse stock · EN 10204 3.1 MTCs · Certificates of Conformance. The only SAEP-347 stockist headquartered in Jeddah serving the entire western region. Contact us →
A qualified SAEP-347 stockist must satisfy five criteria simultaneously: valid Saudi CR, ISO 9001:2015 certification, physical inventory in Saudi Arabia, EN 10204 3.1 mill test certificates with heat-number traceability, and Certificates of Conformance for every item. A supplier missing any single criterion cannot support Aramco Goods Receipt.
All 59 SAEP-347 Annex 4 material numbers are available from Gulf Union Ozone's Jeddah warehouse with full documentation. The table below shows the product categories, material standards, and certificate requirements.
| Product Category | Material / Grade | Standard | Annex 4 Nos. | MTC Required |
|---|---|---|---|---|
| Gate Valves | A216 WCB · A105 · SS316 | ASME B16.34 | ~8 | EN 10204 3.1 |
| Ball Valves | A216 WCB · A105 · SS316 | ASME B16.34 | ~7 | EN 10204 3.1 |
| Globe Valves | A216 WCB · SS316 | ASME B16.34 | ~4 | EN 10204 3.1 |
| Check Valves (Swing) | A216 WCB · SS316 | ASME B16.34 | ~4 | EN 10204 3.1 |
| Butt-Weld Elbows & Tees | ASTM A234 WPB · A403 WP316 | ASME B16.9 | ~8 | EN 10204 3.1 |
| Reducers & Caps | ASTM A234 WPB · A403 WP316 | ASME B16.9 | ~6 | EN 10204 3.1 |
| Flanges (WN, SO, BL, SW) | ASTM A105 · A182 F316 | ASME B16.5 | ~14 | EN 10204 3.1 |
| Metallic Pipes (CS & SS) | ASTM A106 Gr.B · A312 TP316 | ASME B36.10 / B36.19 | ~8 | EN 10204 3.1 |
| Total SAEP-347 Annex 4 Stockable Material Numbers | 59 | |||
Annex 4 material number counts are approximate by category. View all 59 SAEP-347 material numbers →
All 59 SAEP-347 Annex 4 material numbers — covering gate, ball, globe, check, and butterfly valves plus butt-weld fittings, flanges, and metallic pipes — are stocked at Gulf Union Ozone's Jeddah warehouse, each supplied with EN 10204 3.1 mill test certificates, heat-number traceability packs, and Certificates of Conformance.
Western Region Aramco projects — including Yanbu Refinery, YASREF, Petro Rabigh, Jeddah Refinery, and infrastructure projects throughout Makkah and Madinah provinces — require the same SAEP-347 compatible materials as Eastern Province projects. Sourcing from a Jeddah-based SAEP-347 stockist offers significant logistical advantages.
| Factor | Western Region Stockist (Jeddah) | Eastern Province Supplier |
|---|---|---|
| Delivery to Yanbu / Rabigh | 2–3 days | 6–8 days |
| Delivery to Jeddah projects | Same day / Next day | 5–7 days |
| Emergency shutdown supply | Expedited within hours | Multi-day transit minimum |
| SAEP-347 material numbers | All 59 Annex 4 numbers | Varies by supplier |
| EN 10204 3.1 MTCs | Included with every order | Varies by supplier |
| Saudi CR & ISO 9001:2015 | CR 4030570569 · ISO certified | Verify individually |
Yanbu Refinery, YASREF (Yanbu Aramco Sinopec Refining), and Petro Rabigh are all within 3–4 hours of our Jeddah warehouse. Emergency orders can be dispatched the same day for western region shutdown requirements.
Jeddah Refinery (Saudi Aramco, Jeddah) is a key western region client. As a Jeddah-based SAEP-347 stockist, we deliver to Jeddah Refinery with same-day or next-day lead times for most SAEP-347 Annex 4 items.
Vision 2030 mega-projects in Makkah and Madinah provinces require SAEP-347 compatible valves and fittings for utility and infrastructure applications. Gulf Union Ozone covers the entire western region from our Jeddah headquarters.
For Saudi Aramco projects in the Western Region — Jeddah Refinery, YASREF, Petro Rabigh, and Makkah/Madinah infrastructure — sourcing SAEP-347 materials from a Jeddah-based stockist reduces delivery lead times from 5–7 days (Eastern Province) to same-day or next-day for Jeddah projects and 2–3 days for Yanbu and Rabigh.
EPC contractors supplying SAEP-347 materials to western region megaprojects — King Abdullah Economic City (KAEC) near Rabigh, Jeddah Central Development (2.6 km² urban regeneration), Neom's Sindalah Island, and the Red Sea Amaala project — routinely stage procurement from Jeddah. The combination of King Abdulaziz Port (Jeddah Islamic Port) and GACA's King Abdulaziz International Airport gives the western region the fastest logistics hub in Saudi Arabia for both sea and air freight. Gulf Union Ozone's Jeddah warehouse delivers SAEP-347 materials to KAEC construction sites in 2–3 hours and to Yanbu Industrial City — a key petrochemical hub for SABIC, Sipchem, and Aramco Gas Operations — in approximately 4 hours by road, without port clearance delays.
59 Annex 4 material numbers · EN 10204 3.1 MTCs · ISO 9001:2015 · Jeddah warehouse · 48–72h dispatch ·