A SAEP-347 stockist is a Saudi-registered supplier that maintains physical inventory of materials listed in Saudi Aramco Engineering Procedure SAEP-347, Annex 4 — the 59 stockable 9COMS material numbers covering valves, pipe fittings, flanges, and metallic pipes.
The procedure was introduced to streamline procurement for Saudi Aramco's most frequently purchased commodity materials. Instead of specifying individual material requirements each time, procurement engineers can reference an Annex 4 material number and a qualified stockist supplies the corresponding item with all required documentation.
In Saudi Aramco's Materials System (SAP), these 59 items are classified as 9COMS (9000-class commodity materials that are stockable). Procurement engineers searching for a "9COM supplier," "9CAT valve supplier," or "SAEP-347 Annex 4 stockist" are looking for the same thing — a supplier holding physical stock of these 59 material numbers in Saudi Arabia.
All 59 SAEP-347 Annex 4 material numbers follow Aramco's 10-digit format beginning with 6000XXXXXX.
مخزن SAEP-347 هو مورد مسجل في المملكة العربية السعودية يحتفظ بمخزون فعلي لأرقام المواد الـ59 في الملحق 4 من إجراء SAEP-347 — مواد 9COMS التي تشمل الصمامات والتجهيزات والفلنجات والأنابيب المعدنية — مع شهادات فحص المصنع وفق EN 10204 3.1 وإمكانية تتبع رقم الدفعة المطلوبة لاستلام البضائع لدى أرامكو السعودية.
Before selecting a SAEP-347 stockist for your western region project, verify that the supplier meets all five criteria below. A stockist that fails any one criterion cannot support Aramco Goods Receipt.
The stockist must hold a valid Saudi Arabian CR (Commercial Registration). Verify the CR number matches the invoice and shipping documents. Gulf Union Ozone CR: 4030570569.
Saudi Aramco procurement typically requires ISO 9001:2015 certification for qualified stockists. Request a current certificate with a scope covering industrial parts distribution. Gulf Union Ozone: ISO 9001:2015 certified.
A genuine stockist maintains physical inventory in Saudi Arabia — not a virtual catalogue. Confirm the supplier can dispatch the required SAEP-347 Annex 4 items within days, not weeks. Gulf Union Ozone: Jeddah warehouse, 48–72h dispatch.
Every SAEP-347 Annex 4 item must be accompanied by an EN 10204 3.1 MTC showing actual (not nominal) chemical and mechanical values, the heat number, and a certified 3.1 inspector's signature. Photocopied or 2.2 certificates will cause GR rejection. MTC guide →
A Certificate of Conformance confirming the item meets the specified SAEP-347 material number requirements must accompany each order. The CoC must be signed by an authorized representative and cross-referenced to the MTC heat number for full traceability.
CR 4030570569 · ISO 9001:2015 · Jeddah warehouse stock · EN 10204 3.1 MTCs · Certificates of Conformance. The only SAEP-347 stockist headquartered in Jeddah serving the entire western region. Contact us →
يجب أن يستوفي مخزن SAEP-347 المؤهل خمسة معايير في آنٍ واحد: سجل تجاري سعودي ساري، وشهادة ISO 9001:2015، ومخزون فعلي في المملكة العربية السعودية، وشهادات فحص المصنع وفق EN 10204 3.1 مع إمكانية تتبع رقم الدفعة، وشهادات مطابقة لكل بند. أي مورد يفتقر إلى أي من هذه المعايير لا يمكنه دعم عملية استلام البضائع لدى أرامكو.
All 59 SAEP-347 Annex 4 material numbers are available from Gulf Union Ozone's Jeddah warehouse with full documentation. The table below shows the product categories, material standards, and certificate requirements.
| Product Category | Material / Grade | Standard | Annex 4 Nos. | MTC Required |
|---|---|---|---|---|
| Gate Valves | A216 WCB · A105 · SS316 | ASME B16.34 | ~8 | EN 10204 3.1 |
| Ball Valves | A216 WCB · A105 · SS316 | ASME B16.34 | ~7 | EN 10204 3.1 |
| Globe Valves | A216 WCB · SS316 | ASME B16.34 | ~4 | EN 10204 3.1 |
| Check Valves (Swing) | A216 WCB · SS316 | ASME B16.34 | ~4 | EN 10204 3.1 |
| Butt-Weld Elbows & Tees | ASTM A234 WPB · A403 WP316 | ASME B16.9 | ~8 | EN 10204 3.1 |
| Reducers & Caps | ASTM A234 WPB · A403 WP316 | ASME B16.9 | ~6 | EN 10204 3.1 |
| Flanges (WN, SO, BL, SW) | ASTM A105 · A182 F316 | ASME B16.5 | ~14 | EN 10204 3.1 |
| Metallic Pipes (CS & SS) | ASTM A106 Gr.B · A312 TP316 | ASME B36.10 / B36.19 | ~8 | EN 10204 3.1 |
| Total SAEP-347 Annex 4 Stockable Material Numbers | 59 | |||
Annex 4 material number counts are approximate by category. View all 59 SAEP-347 material numbers →
جميع أرقام المواد الـ59 في الملحق 4 من SAEP-347 — التي تشمل صمامات البوابة والكرة والمقصورة والنسق والفراشة إضافةً إلى تجهيزات اللحام الأمامي والفلنجات والأنابيب المعدنية — متوفرة في مستودع غلف يونيون أوزون بجدة، وكل وحدة مرفقة بشهادة فحص مصنع EN 10204 3.1 وحزمة تتبع رقم الدفعة وشهادة المطابقة.
Western Region Aramco projects — including Yanbu Refinery, YASREF, Petro Rabigh, Jeddah Refinery, and infrastructure projects throughout Makkah and Madinah provinces — require the same SAEP-347 compatible materials as Eastern Province projects. Sourcing from a Jeddah-based SAEP-347 stockist offers significant logistical advantages.
| Factor | Western Region Stockist (Jeddah) | Eastern Province Supplier |
|---|---|---|
| Delivery to Yanbu / Rabigh | 2–3 days | 6–8 days |
| Delivery to Jeddah projects | Same day / Next day | 5–7 days |
| Emergency shutdown supply | Expedited within hours | Multi-day transit minimum |
| SAEP-347 material numbers | All 59 Annex 4 numbers | Varies by supplier |
| EN 10204 3.1 MTCs | Included with every order | Varies by supplier |
| Saudi CR & ISO 9001:2015 | CR 4030570569 · ISO certified | Verify individually |
Yanbu Refinery, YASREF (Yanbu Aramco Sinopec Refining), and Petro Rabigh are all within 3–4 hours of our Jeddah warehouse. Emergency orders can be dispatched the same day for western region shutdown requirements.
Jeddah Refinery (Saudi Aramco, Jeddah) is a key western region client. As a Jeddah-based SAEP-347 stockist, we deliver to Jeddah Refinery with same-day or next-day lead times for most SAEP-347 Annex 4 items.
Vision 2030 mega-projects in Makkah and Madinah provinces require SAEP-347 compatible valves and fittings for utility and infrastructure applications. Gulf Union Ozone covers the entire western region from our Jeddah headquarters.
لمشاريع أرامكو السعودية في المنطقة الغربية — مصفاة جدة وYASREF وبترو رابغ ومشاريع البنية التحتية في مكة المكرمة والمدينة المنورة — يُقلل التوريد من مخزن يتخذ من جدة مقراً له أوقات التسليم من 5–7 أيام (من المنطقة الشرقية) إلى نفس اليوم أو اليوم التالي لمشاريع جدة و2–3 أيام لينبع ورابغ.
يعتمد مقاولو EPC في مشاريع المنطقة الغربية — مدينة الملك عبدالله الاقتصادية (كاك) قرب رابغ، مشروع جدة المركزية، جزيرة سندالة في نيوم، ومشروع البحر الأحمر أمالا — على مخازن جدة للتوريد. يوفر ميناء جدة الإسلامي ومطار الملك عبدالعزيز أفضل بنية لوجستية في المملكة. يوصل اتحاد الخليج أوزون مواد SAEP-347 لمواقع كاك في 2–3 ساعات، ولمدينة ينبع الصناعية في نحو 4 ساعات برياً.
59 Annex 4 material numbers · EN 10204 3.1 MTCs · ISO 9001:2015 · Jeddah warehouse · 48–72h dispatch ·