Gulf Union Ozone designs, supplies, and commissions power factor correction (PFC) and harmonic mitigation systems for Saudi Arabia's industrial, manufacturing, water treatment, and commercial sectors. Our PFC portfolio covers fixed three-phase LV (400 V) and MV (6.6–33 kV) capacitor banks from 25 to 600 kvar, automatic PFC panels (APFC) with 6 to 12 capacitor steps maintaining power factor between 0.95 and unity in response to variable loads, and detuned reactor sets (p = 7% and p = 14%) for all installations where VFDs, UPS systems, or rectifiers create 5th and 7th harmonic distortion that could resonate with uncorrected capacitor banks. For plants with high harmonic content, passive C-type harmonic filters and active harmonic filters reduce THD below the 5% limit required by Saudi Electricity Company's Distribution Code and IEC 61000-3-12. Power quality analysers (IEC 61000-4-30 Class A and Class S) are available for portable site audits and panel-mounted power quality monitoring. Smart reactive power controllers with RS-485 Modbus and Ethernet connectivity enable SCADA integration for real-time PF monitoring at Saudi distribution panels and substations. All PFC systems are designed to meet SEC Distribution Code requirements: PF ≥ 0.90 lagging at the metering point, THD voltage ≤ 5%, individual harmonic ≤ 3%. IEC 60831-1 certified self-healing metallised polypropylene capacitor elements are used in all bank assemblies — 10-year design life rated for Saudi Arabia's 50°C ambient. Gulf Union Ozone provides a free 48-hour power quality audit before every PFC recommendation. ISO 9001:2015 certified. CR 4030570569. Assembled and dispatched from Jeddah.

Gulf Union Ozone supplies six power factor correction and power quality product families for Saudi Arabia industrial, commercial, and process plant electrical systems — all designed to comply with SEC Distribution Code power factor and harmonic limits, with free power audit before every system recommendation.
Three-phase LV (400 V) and MV (6.6–33 kV) fixed capacitor banks in kvar ratings from 25 to 600 kvar; improve power factor for fixed-load Saudi industrial processes and distribution substations. Fixed capacitor banks are the most cost-effective PFC solution for Saudi plants with constant or slowly varying reactive power demand — such as fixed-speed induction motor drives, arc furnace transformers at steady load, or distribution substation buses with predominantly inductive load. LV banks use IEC 60831-1 self-healing metallised polypropylene capacitor elements with built-in overpressure disconnectors. MV banks (6.6 kV, 11 kV, and 33 kV) use dry-type or oil-filled capacitor units in enclosed switchgear cubicles, with current-limiting HRC fuse protection. Gulf Union Ozone stocks standard LV fixed banks (25, 50, 100, 200, 400 kvar) for same-day dispatch from Jeddah.
Microprocessor-controlled APFC relay panels with 6–12 capacitor steps; maintain power factor between 0.95 and unity in response to variable loads at Saudi factories, water treatment plants and industrial complexes. APFC panels continuously monitor the reactive power demand at the metering point using a built-in current transformer and voltage sensing circuit, and switch capacitor steps in or out to maintain the target power factor set by the relay (typically PF = 0.95–1.00 lagging). Each step uses a contactless thyristor switch (TSVC) or conventional contactor with detuned reactor. Gulf Union Ozone assembles 400 V APFC panels with 6, 8, 10, and 12 steps in ratings from 50 kvar to 600 kvar at its Jeddah facility, with type-tested enclosures (IP41 indoor, IP54 outdoor), dispatch in 2–3 weeks, and commissioning support across Saudi Arabia.
Series-connected reactors (p = 7%, 14%) fitted with capacitor banks to suppress 5th and 7th harmonic resonance; mandatory where VFDs, UPS systems or rectifiers create harmonic distortion in Saudi electrical systems. A detuned (series reactor) capacitor bank has its resonant frequency shifted below the dominant system harmonic — a p = 7% reactor tunes the bank to 189 Hz (below the 5th harmonic at 250 Hz for 50 Hz systems), preventing parallel resonance with system inductance at harmonic frequencies. This eliminates capacitor overload, nuisance tripping, and fuse failure that occur when plain capacitor banks are used on Saudi electrical systems with significant VFD or UPS populations. Gulf Union Ozone supplies detuned reactor-capacitor sets as matched units in ratings from 25 to 600 kvar; reactors are air-cooled, encapsulated dry-type with Class H insulation for Saudi 50°C ambient service.
Passive C-type and active harmonic filters for THD reduction below 5% at the point of common coupling; required to meet Saudi SEC (Electricity and Cogeneration Regulatory Authority) power quality limits. Passive C-type harmonic filters are tuned to specific harmonic frequencies (5th at 250 Hz, 7th at 350 Hz, 11th/13th at 550/650 Hz) and also provide reactive power compensation at fundamental frequency — combining PFC and harmonic filtering in a single unit. Active harmonic filters (AHF) inject an anti-phase harmonic current into the electrical system to cancel the harmonic currents injected by VFDs, UPS units, and rectifiers, reducing total harmonic distortion (THD-I) to below 5% regardless of load variation. Gulf Union Ozone supplies active harmonic filters in 50 A, 100 A, and 150 A ratings for connection at LV panel bus, suitable for Saudi Aramco, SABIC, and HADEED steel plant electrical systems.
Portable and panel-mount power quality analysers measuring PF, THD, kW, kvar, kVA, harmonics (H2–H50), flicker, dips and swells; essential for Saudi plant power audits before PFC installation. Accurate measurement of the power factor and harmonic content at the metering point is the essential first step before specifying any PFC system — specifying capacitors on a plant with high harmonic content without measurement risks resonance and capacitor failure. Gulf Union Ozone supplies IEC 61000-4-30 Class A analysers (the highest accuracy class, required for SEC tariff disputes and official power quality compliance testing) and Class S analysers for general plant surveys. Portable loggers are deployed for Gulf Union Ozone's free 48-hour power audit; panel-mount analysers with RS-485 Modbus are available for permanent installation at Saudi industrial LV distribution boards.
Smart APFC relay controllers with RS-485 Modbus or Ethernet interface, LCD display and data logging; available with SCADA integration for real-time power factor monitoring at Saudi distribution panels. The reactive power controller (APFC relay) is the intelligence of an automatic PFC panel — it continuously measures reactive current demand, calculates the required capacitor switching steps, and activates or deactivates contactors or thyristor switches to maintain the target power factor. Gulf Union Ozone supplies microprocessor-based APFC relays with 6- and 12-output versions, LCD display for local kvar and PF readout, RS-485 Modbus RTU or Ethernet TCP/IP communication for SCADA integration, and internal data logging of PF, kvar, and capacitor switching events. Compatible with all leading capacitor contactor brands; suitable for Saudi Aramco and SABIC plant DCS integration.
All PFC systems designed to meet SEC Distribution Code (PF ≥ 0.90, THD ≤ 5%). IEC 60831 certified capacitors. Free 48-hour power quality audit included with quotation. ISO 9001:2015 (CR 4030570569). Assembled at Jeddah facility; delivery and commissioning across Saudi Arabia.
| Product | Voltage Rating | kvar / kW Rating | Steps / THD | Standard |
|---|---|---|---|---|
| Fixed Capacitor Bank — LV 25 kvar | 400 V, 3-phase | 25 kvar | Fixed (1 step) | IEC 60831-1 / IEC 60439 / SASO |
| Fixed Capacitor Bank — LV 50 kvar | 400 V, 3-phase | 50 kvar | Fixed (1 step) | IEC 60831-1 / IEC 60439 / SASO |
| Fixed Capacitor Bank — LV 100 kvar | 400 V, 3-phase | 100 kvar | Fixed (1 step) | IEC 60831-1 / IEC 60439 / SASO |
| Fixed Capacitor Bank — LV 200 kvar | 400 V, 3-phase | 200 kvar | Fixed (1 step) | IEC 60831-1 / IEC 60439 / SASO |
| Fixed Capacitor Bank — MV 6.6 kV | 6.6 kV, 3-phase | 100–600 kvar | Fixed | IEC 60871 / IEC 62271-200 / SASO |
| Fixed Capacitor Bank — MV 11 kV | 11 kV, 3-phase | 200–1 000 kvar | Fixed | IEC 60871 / IEC 62271-200 / SEC EDC |
| Fixed Capacitor Bank — MV 33 kV | 33 kV, 3-phase | 500–3 000 kvar | Fixed | IEC 60871 / SEC Distribution Code |
| APFC Panel — 400 V, 6-Step | 400 V, 3-phase, 50 Hz | 50–300 kvar total | 6 switched steps | IEC 60831 / IEC 60439 / SEC EDC |
| APFC Panel — 400 V, 8-Step | 400 V, 3-phase, 50 Hz | 100–400 kvar total | 8 switched steps | IEC 60831 / IEC 60439 / SEC EDC |
| APFC Panel — 400 V, 10-Step | 400 V, 3-phase, 50 Hz | 150–500 kvar total | 10 switched steps | IEC 60831 / IEC 60439 / SEC EDC |
| APFC Panel — 400 V, 12-Step | 400 V, 3-phase, 50 Hz | 200–600 kvar total | 12 switched steps | IEC 60831 / IEC 60439 / SEC EDC |
| Detuned Reactor Set — p=7%, 25–100 kvar | 400 V | 25–100 kvar per step | Resonant at 189 Hz (below 5th H) | IEC 60831 / IEC 60076-6 / SEC EDC |
| Detuned Reactor Set — p=14%, 25–100 kvar | 400 V | 25–100 kvar per step | Resonant at 134 Hz (below 3rd H) | IEC 60831 / IEC 60076-6 — high harmonic environments |
| Detuned Reactor Set — p=7%, 200–600 kvar | 400 V | 200–600 kvar per step | Resonant at 189 Hz | IEC 60831 / IEC 60076-6 — large Saudi industrial LV boards |
| Passive Harmonic Filter — 5th Harmonic (250 Hz) | 400 V | 50–600 kvar (also provides PFC) | THD-V ≤ 5% at PCC | IEC 61000-3-12 / SEC EDC — VFD-heavy Saudi plants |
| Passive Harmonic Filter — 7th Harmonic (350 Hz) | 400 V | 50–400 kvar | THD-V ≤ 5% at PCC | IEC 61000-3-12 / SEC EDC — 6-pulse rectifier harmonic mitigation |
| Passive Harmonic Filter — 11th/13th (C-Type) | 400 V / 6.6 kV | 100–1 000 kvar | THD-V ≤ 3% at PCC | IEC 61000-3-12 — 12-pulse converter and HADEED-type steel plant loads |
| Active Harmonic Filter — 50 A | 400 V, 3-phase | Compensation to 50 A harmonic current | THD-I < 5% at PCC | IEC 61000-3-12 / SEC EDC — small VFD and UPS harmonic mitigation |
| Active Harmonic Filter — 100 A | 400 V, 3-phase | Compensation to 100 A harmonic current | THD-I < 5% at PCC | IEC 61000-3-12 — medium Saudi industrial plant VFD and rectifier loads |
| Active Harmonic Filter — 150 A | 400 V, 3-phase | Compensation to 150 A harmonic current | THD-I < 5% at PCC | IEC 61000-3-12 — SABIC, HADEED, large Saudi industrial harmonic mitigation |
| Power Quality Analyser — Class A (IEC 61000-4-30) | LV / MV (with CT/VT) | Measures kW, kvar, kVA, PF, THD, H2–H50 | Class A accuracy | IEC 61000-4-30 Class A — SEC metering disputes and compliance testing |
| Power Quality Analyser — Class S (Portable Logger) | LV / MV (clip-on CT) | Measures kW, kvar, PF, THD, harmonics, flicker | Class S accuracy | IEC 61000-4-30 Class S — Gulf Union Ozone free 48-hour Saudi plant audit |
| Reactive Power Controller — 6-Output (Modbus) | 400 V (CT sensing) | Controls 6 capacitor steps | RS-485 Modbus RTU | IEC 61000-4-30 — APFC relay for Saudi LV distribution boards |
| Reactive Power Controller — 12-Output (Ethernet) | 400 V (CT sensing) | Controls 12 capacitor steps | RS-485 / Ethernet TCP/IP | SCADA-integrated APFC — Saudi Aramco DCS and SABIC plant energy management |
| Capacitor Fuse — HRC Backup (LV) | 400 V / 690 V | 16–160 A | Backup protection for capacitor element fault | IEC 60831 / IEC 60269 — LV PFC panel capacitor protection Saudi Arabia |
| Thyristor Switch (TSVC) — Fast Capacitor Switching | 400 V, 3-phase | 25–300 kvar per switch | Zero-crossing switch (no transient) | Transient-free fast switching — pulsating loads, arc welders, Saudi foundries |
| Voltage Stabiliser (Static AVR) | 400 V, 3-phase | 10–2 000 kVA | ±1% output regulation | Voltage stabilisation for sensitive Saudi industrial equipment and CNC machinery |
| Motor Soft Starter with PF Correction | 400 V, 3-phase | 7.5–630 kW motor | Limits inrush; built-in PFC relay | Pump, fan, and compressor reduced-voltage starting — Saudi water and process plants |
All PFC systems designed to meet Saudi Electricity Company (SEC) distribution code limits: PF ≥ 0.90 lagging at point of metering, THD voltage ≤ 5%, THD current per IEC 61000-3-12. Gulf Union Ozone provides written SEC compliance confirmation with every APFC and harmonic filter system supplied to Saudi industrial customers.
Capacitor banks use IEC 60831-1 (self-healing, metallised polypropylene) capacitor elements with built-in overpressure disconnector; 10-year design life in Saudi 50°C ambient. Self-healing capability prevents catastrophic capacitor failure from dielectric puncture — critical in Saudi Arabia's high-temperature industrial environment.
Free 48-hour power quality audit (power analyser logger installed at Saudi plant LV board) before recommending PFC equipment. Audit measures actual PF, kvar demand, harmonic content, and load profile — ensuring the correct PFC solution is specified without resonance risk. Written audit report provided.
Standard APFC panels (400V, 6–12 steps, up to 300 kvar) assembled and tested at Jeddah facility; dispatch in 2–3 weeks. Fixed capacitor banks (LV 25–200 kvar) ship next day from stock. Commissioning and SEC compliance testing service available across Saudi Arabia — Jubail, Yanbu, Dammam, Riyadh, and Jizan.
IE2 and IE3 efficiency induction motors, Ex-rated motors, and high-voltage motors for Saudi pumps, fans, compressors, and process machinery — IEC 60034, ATEX, and IECEx certified.
LV and MV variable frequency drives (VFDs) for energy-efficient speed control of Saudi industrial motors — includes harmonic analysis and detuned reactor specification as standard with every VFD supply.
Distribution transformers, dry-type transformers, MV switchgear, and LV distribution boards for Saudi Arabia industrial substations and power distribution systems — SEC and SASO compliant.
Synchronous alternators for diesel and gas generator sets at Saudi Arabia industrial plants, oil and gas camps, hospitals, and data centres — IEC 60034, IP23–IP55, 50 kVA to 3 MVA.
Saudi Electricity Company (SEC) Electricity Distribution Code (EDC) requires industrial customers to maintain a minimum power factor of 0.90 lagging at the point of metering during peak and off-peak periods. Customers with PF below 0.90 are subject to reactive power charges on their SEC electricity bill. For large consumers (above 1 MVA), the SEC also enforces harmonic distortion limits (THD voltage ≤ 5%, individual harmonic ≤ 3%) per IEC 61000-3-12. Gulf Union Ozone designs APFC and harmonic filter systems to meet both PF and THD requirements simultaneously.
Variable frequency drives (VFDs), UPS systems and other non-linear loads inject 5th and 7th harmonic currents into the electrical system. If uncorrected capacitor banks are connected to the same busbar, they can resonate with system inductance at the harmonic frequency, causing capacitor overload, nuisance fuse blowing and switchgear tripping. Detuned reactors (series inductors) shift the capacitor bank resonant frequency below the dominant harmonic (typically to 189 Hz for a p=7% reactor, below the 5th harmonic at 250 Hz). Gulf Union Ozone always audits the harmonic environment before specifying PFC equipment on Saudi plants with VFD installations.
Payback on a Saudi PFC installation depends on reactive power charge tariff, kvar demand and PFC equipment cost. At current SEC tariffs (approximately SAR 0.05–0.10/kvarh reactive energy charge), a 500 kvar APFC panel costing SAR 45 000 installed typically achieves payback in 12–18 months. Plants with large induction motor loads (pumps, fans, compressors) and PF below 0.80 see the fastest payback. Gulf Union Ozone provides a written payback calculation before quotation, based on the customer's SEC electricity bill and the measured power factor from the free power audit.
To get a fast quotation, provide: supply voltage (400 V LV or MV), total installed motor kW or MVA, current power factor (from SEC electricity bill or on-site measurement), presence of VFDs or UPS systems (for harmonic assessment), required kvar correction, delivery location in Saudi Arabia, and whether a free 48-hour power quality audit is required before specification.
Recent Deliveries
CR 4030570569 | ISO 9001:2015 | Jeddah, Saudi Arabia — Saudi Aramco vendor compliance · SAEP-347 credentials
Technical content reviewed by Gulf Union Ozone's Engineering Team, Jeddah — 2026
Inventory updated: September 2026
Gulf Union Ozone Trading Co. supplies Power Factor Correction Systems to industrial customers across Saudi Arabia with delivery from our Jeddah warehouse — all products ship with original certificates and compliance documentation for Aramco, SABIC, and government projects.
Power Factor Correction Systems from Gulf Union Ozone serves Saudi Aramco operations, SABIC, SADARA, SEC utilities, NEOM mega-projects, and major industrial facilities across the Kingdom — our inventory covers the most common specifications and grades.
Gulf Union Ozone stocks a comprehensive range of Power Factor Correction Systems — contact us for immediate availability confirmation and a competitive quotation with full compliance documentation.
For urgent Power Factor Correction Systems procurement in Saudi Arabia, WhatsApp +966 55 098 8062 — our team confirms stock availability within the hour and provides competitive quotations for Aramco, SABIC, SEC, and government projects.