توريد خطوط أنابيب ومحطات تحلية مياه SWCC
محطات الكهرباء ومشاريع الشبكة في نجران
توريد أنابيب وصمامات صناعية لتصنيع الأسمنت
مواد SAEP-347 لعمليات الغاز في نجران والجنوب
الري في وادي نجران وصوامع الحبوب والتوريد الزراعي الصناعي
قطع صيانة لقاعدة نجران الجوية والمنشآت العسكرية
Gulf Union Ozone dispatches from our Jeddah warehouse via Route 15 (King Khalid Road / مكة-نجران) — the principal highway connecting the Hejaz and Asir regions to Najran Province in the far south. The route passes through Abha and the Asir Mountains before descending to the Najran plateau — approximately 1,150 km from Jeddah to Najran city.
For Sharourah (approximately 350 km south-east of Najran via Route 177 toward the Rub' al Khali), combined transit from Jeddah is approximately 96 hours. Contact us via WhatsApp to confirm freight arrangements for Sharourah deliveries.
| Destination | Route | Distance | Lead Time |
|---|---|---|---|
| Najran city | Route 15 via Abha | ~1,150 km | 72 hours |
| Hubuna / Yadamah | Route 15 → Route 177 | ~1,050 km | 72 hours |
| Sharourah (Sharurah) | Route 15 → Route 177 | ~1,500 km | 96 hours |
| Emergency dispatch | Express freight | Any location | 4h dispatch |
Gulf Union Ozone supplies Najran SWCC, SEC, and government project orders with: Saudi VAT invoice (VAT No. 311592828300003), EN 10204 3.1 Mill Test Certificates, Certificate of Conformance, packing list with heat number traceability, and delivery note. ISO 9001:2015 quality certificate available on request.
Quality certifications →فئات المنتجات التالية محزونة في مستودعنا بجدة وتُورَّد لـنجران. جميع الأصناف تستوفي متطلبات SAEP-347 الملحق 4.
| Product Category | Material Standard | SAEP-347 Nos. | Certificate |
|---|---|---|---|
| Gate Valves | A216 WCB / A105 / SS316 | 8 mat. nos. | EN 10204 3.1 |
| Ball Valves | A216 WCB / A105 / SS316 | 7 mat. nos. | EN 10204 3.1 |
| Check & Globe Valves | A216 WCB / SS316 | 8 mat. nos. | EN 10204 3.1 |
| Pipe Fittings (BW) | ASTM A234 WPB · ASME B16.9 | 12 mat. nos. | EN 10204 3.1 |
| Flanges (WN, SO, BL, SW) | ASTM A105 · ASME B16.5 | 14 mat. nos. | EN 10204 3.1 |
| Metallic Pipes (CS & SS) | ASTM A106 Gr.B · A312 TP316 | 10 mat. nos. | EN 10204 3.1 |
* Material number counts are approximate; exact SAEP-347 Annex 4 numbers on the Aramco procurement page.
CR 4030570569 · VAT 311592828300003 · ISO 9001:2015 ·
المنتجات المتاحة في نجران
Najran Region sits at the confluence of southern Saudi Arabia's construction boom, border trade, and the emerging infrastructure expansion into the kingdom's southern tier under Vision 2030. Gulf Union Ozone supplies SAEP-347 compliant valves, pipe fittings, and process equipment to construction contractors, cement producers, and infrastructure project managers in Najran — delivering from Jeddah in 72 hours via the Najran–Jizan highway corridor. Najran Cement Company and regional cement producers require industrial process equipment including butterfly valves, globe valves, and ASME B16.5 flanges for cement plant dry-process pneumatic conveying and kiln burner fuel supply systems. Gulf Union Ozone stocks Hastelloy C-276 and Alloy 20 valves for cement plant acidic media applications, alongside standard carbon steel and stainless steel grades for utility piping, all supplied with EN 10204 3.1 mill test certificates and SABER conformity documentation for Saudi Customs clearance.
Saudi Electricity Company infrastructure projects in Najran and the Sharurah area — substations, transmission towers, and industrial power distribution — require electrical cable assemblies, conduit systems, explosion-proof junction boxes, and cable glands for outdoor electrical installation in the high ambient temperature Najran desert environment. Gulf Union Ozone supplies armoured cable assemblies, HDPE conduit, and IP65/IP67 rated junction boxes suitable for SEC outdoor electrical installations in the Najran Region. Border trade logistics companies operating through Najran Dry Port — handling Saudi imports and export transit cargo — require pipeline flanges, valves, and industrial equipment for port infrastructure maintenance and expansion. SAR-denominated invoicing, Arabic-language packing documentation, and Saudi Customs HS code declarations streamline customs processing at the Najran border crossing for transit freight requiring SABER conformity certificates and customs clearance verification on all standard materials.
Najran's growing construction sector — apartment complexes, commercial buildings, and government facility expansions driven by Vision 2030 housing targets — requires mechanical, electrical, and plumbing materials including copper tube fittings, brass ball valves, and PVC pipe fittings for building services. Gulf Union Ozone supplies MEP contractors in Najran with a complete range of building services materials: brass compression fittings, press-fit copper fittings, thermoplastic and bronze butterfly valves for HVAC systems, and pressure-reducing valves for high-rise building water supply systems. Technical guidance on pressure zoning for multi-storey buildings in Najran — where municipal water pressure can vary significantly — is provided by our plumbing engineering team at no charge. EN 10204 2.1 test reports and Saudi SASO conformity marks accompany all pressure fittings and valves supplied for building permit inspection submission by Najran Region contractors and developers.
Gulf Union Ozone is Najran's nearest Saudi-stocked supplier of SAEP-347 and ASME-compliant industrial piping materials — offering 72-hour delivery from Jeddah without the 6–8 week lead time of international direct import from European or Asian manufacturers. Our Saudi VAT invoice and IKTVA local content documentation satisfy Najran Region contractor compliance requirements for Vision 2030 local procurement reporting. Construction and infrastructure procurement managers in Najran can submit RFQs via WhatsApp with material specifications and receive formal SAR quotations within 4 business hours covering price, delivery, EN 10204 documentation level, and SABER conformity certificate status. Carbon steel pipe, butt-weld fittings, flanges, gate, globe, ball, butterfly and check valves, and instrumentation gauge sets are all available from Jeddah ex-stock for 72-hour Najran delivery — including urgent weekend dispatch for maintenance emergencies with prior arrangement.